
TCL are proud to have been associated with the Channel Tunnel Rail Link project at St. Pancras, London
TCL gain OHSAS 18001 accreditation...
TCL attained ISO14001 on June 21st 2007
TCL is delighted to announce the recent award of six major projects for 2008.
TCL’s Commercial Division is professionally structured to meet and exceed our clients’ requirements for the skills and operational resources necessary to successfully complete large commercial contracts.
Our ability to integrate the site delivery and logistics teams with that of our customers, allows us to collaborate effectively to ensure excellent, built solutions are continually achieved as a result.
Our design expertise allied to our ability to source high quality material in metal suspended ceilings and drywall systems allows us to assist in producing technical, programme and cost–related solutions from an early stage. This not only adds cost certainty, but also assists in the co-ordination of the internal built elements within any proposed project.