
TCL are proud to have been associated with the Channel Tunnel Rail Link project at St. Pancras, London
TCL gain OHSAS 18001 accreditation...
TCL attained ISO14001 on June 21st 2007
TCL is delighted to announce the recent award of six major projects for 2008.
At TCL we continually strive for new and innovative processes to save costs, reduce time on site and to increase installation speed and efficiency.
Every project has unique requirements, each one presenting us with a challenge that often requires innovation in the form of design, off-site fabrication, programme sequencing and logistics to ensure strict project deadlines are met.
Examples of this include spray-applied processes to negate Taping and Jointing, off-site pre-fabrication of bracketry and metalwork, specially-designed access equipment to get trackside in the Tube environment, lightweight custom-developed linings for overcladding and lightweight panel systems for use in Atria and Lift Lobby areas.
A number of these products are being further developed for more widespread usage to save time and cost through greater efficiency, without sacrificing quality.
For further information on these initiatives and ideas, please contact us.